Deployment on the Europe platform
Scheduled Maintenance Report for Fasterize
Completed
The scheduled maintenance has been completed.
Posted Jun 06, 2019 - 00:30 CEST
In progress
Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 05, 2019 - 22:00 CEST
Scheduled
For a best appreciation of deployment impacts, we use a scale from 0 to 3 :
0 : not critical (no impact is expected after the deployment of the feature or fix, it's often related to the Fasterize website, API or auxiliary tools)
1 : minor (it may have a minor impact on optimized websites operations during the deployment, it's often related to the optimization engine or the cache layer)
2 : major (it may have a major impact on optimized websites. It is advisable to monitor the websites during this deployment).

Fix
[1] [engine] Lazyload is now correctly applied on smartcache fragments
[1] [engine] ensure that resource downloaded by the inliner are images
[1] [engine] update CSS minifier to fix issues on corrupted CSS
[1] [engine] fix Firefox support of the Deferjs in case of script reading src attribute.
[1] [engine] reduce pressure on storage after flush
[0] [engine] early hints for Font are attached to CSS file
[0] [engine] early hints are added on cacheable response
[0] [engine] fix discovery mode when parameter frz-optimize=true and fstrz=false exist
[0] [engine] don't modify onload attribute on link preload
[0] [engine] support content-encoding in uppercase
[1] [api] flush by URL will correctly flush resource compressed via Brotli
Posted Jun 03, 2019 - 17:01 CEST
This scheduled maintenance affected: API, Dashboard, Acceleration, Website, Logs delivery, and Collect.